Date | Description | Reading |
Sep 23 Tu Sep 25 Th Sep 28, Su |
Internet Evolution OSI Stack HW0 due by 11:59pm |
"Internet:
`The Big Picture'" "A Brief History of the Internet" Online Maps Tanenbaum, 1.2, 1.3, 1.4, 1.6 Kurose/Ross, 1.1, 1.2, 1.5, 1.7, 1.8 |
Sep 30, Tu Oct 02, Th Oct 02, Th |
Physical Layer Overview Physical Layer Overview (cont) HW1 due by 2:00pm |
Tanenbaum, 2.1-2.4 Kurose/Ross, 1.4 |
Oct 07, Tu Oct 09, Th |
Quiz
#1 Data Link Layer Overview and Point-to-Point Protocols |
Tanenbaum, 3.1, 3.2, 3.3, 3.4 Kurose/Ross, 5.1, 5.2, 5.8 Latency Article |
Oct 14, Tu Oct 16, Th |
Data Link (Shared Media) Ethernet and other High-Speed Shared Protocols |
Tanenbaum, 4.1, 4.2 Kurose/Ross, 5.3 Tanenbaum, 4.3, 4.4, 4.7.5 Kurose/Ross, 5.5, 5.6, 5.7 |
Oct 21, Tu Oct 23, Th Oct 23, Th |
Network Layer Overview and IP--Part 1 IP--Part 2 HW2 due by 2:00pm |
Tanenbaum, 5.1 Kurose/Ross, 4.1 Tanenbaum, 5.6.1-5.6.3, 5.6.7-5.6.8 Kurose/Ross, 4.4, 4.7, 4.9 |
Oct 28, Tu Oct 30, Th |
Routing Catch Up |
Tanenbaum, 5.2, 5.5.6, 5.6.4, 5.6.5 Kurose/Ross, 4.2, 4.3, 4.5 |
Nov 04, Tu Nov 06, Th |
Quiz
#2 No Class |
|
Nov 11, Tu Nov 13, Th Nov 13, Th |
Holiday: No Class Transport Layer Overview & TCP--Part 1 HW3 due by 2:00pm |
Tanenbaum, 6.1, 6.2, 6.5 Kurose/Ross, 3.1, 3.4, 3.5-3.7 |
Nov 18, Tu Nov 20, Th |
TCP--Part 2, UDP DNS & HTTP/WEB |
Tanenbaum, 6.4 Kurose/Ross 3.3 Tanenbaum, 7.1-7.3 Kurose/Ross, 2.2, 2.4, 2.5 |
Nov 25, Tu Nov 27, Th |
Misc Topics (DHCP, NAT, ATM, Tunnelling) Holiday: No class |
Tanenbaum, 5.6.3, 5.6.2,5.5.5 Kurose/Ross,4.4.6, 4.4.7, 4.7.2 |
Dec 02, Tu Dec 02, Tu |
HW4
due by 2:00pm Internet2 & Campus Network Arch & Final Review |
"Internet2: The Once and Future Net" UCSB Network Information |
Dec 07, Su |
REVIEW SESSION (Time: 4:00pm) Location: Engr I 1104 |
|
Dec 08, Mo |
FINAL EXAM (4:00pm-6:00pm) Location: Broida 1610 |